Deep Horizons Injection Grouting stabilizes failing dry dock floors from below — no tear-out, no excavation, no months of shutdown. One continuous injection fills the voids beneath the slab, displaces the water, and seals the structure, adding around 100 years of life at minimum maintenance cost.
Dry docks fail from below. Hydrostatic pressure builds beneath the floor, driving water through every joint and crack. Voids open up under the slab, the floor heaves, cracks, and drops out of level, and the walls seep. The conventional fix — tearing out the floor, excavating, and rebuilding — takes the dock out of service for months.
The Deep Horizons Injection Grouting solution. A single continuous pipe drills through the floor, deep into the problem zone. Then ONE continuous, non-stop injection runs from the deep bottom all the way up to the underside of the floor, with real-time data showing soil improvement inch by inch, foot by foot, as we go.
How the material works. The polyurethane material enters as a liquid and migrates like oil into cracks, fissures, and soil veins, pushing the water out ahead of it. The reaction is completely unstoppable: it then becomes a hard, dense, rigid foam — curing to between 4,000 PSI and 13,000 PSI — that expands and compacts the soil beneath the slab — and once it fills a void, it stays. Permanent.
Controlled from start to finish. The fill climbs bottom to top, right up to the underside of the floor, monitored in real time until the floor stands level, sealed, and locked solid. Every leak path is sealed and the soil beneath is stabilized in the same pass.
It doesn’t matter how deep — Deep Horizons Injection Grouting has no depth limit.
Why it matters. No tear-out, no excavation, no months of shutdown. The dock goes back to work in days, not months, and the finished floor looks like nothing ever happened. The result is around 100 more years of life with minimum maintenance cost — a permanent fix, delivered from below.
Contact Polymer Technologies USA at (813) 704-7941 to discuss your dry dock project.
Yamil Dominguez, CEO
Polymer Technologies USA
FL Certified General Contractor #CGC1510936
(813) 704-7941
polymertechnologiesus.com
