Rainwater and groundwater are not supposed to be inside a sewer. But through cracked pipes, broken joints, and failed connections, they pour in — and every gallon of that infiltration and inflow gets pumped, transported, and treated exactly like sewage. U.S. EPA Region 1 has put the cost of transporting and treating that excess flow at roughly $2 to $5 per 1,000 gallons (2014), and in older systems infiltration can approach half of everything reaching the treatment plant. The utility pays for it, the ratepayer pays for it — and when a storm hits, the overloaded system overflows.

Lining a pipe seals the inside wall — but it does nothing about the water moving through the soil outside the pipe, washing out the ground that supports it. That is why industry guidance calls for sealing the system from the outside as well: the manholes, the mainline joints, the service connections, the laterals. Deep Horizons Injection Grouting is that outside seal — and it is the step that has to happen before a liner goes in.

The injection casing is set in the soil beside the pipe — it never enters the pipe. The liquid material is injected under high pressure into the eroded void around the pipe, displacing the water ahead of it as a rolling front. It migrates into the cracks and joints, reacts into a hard, dense, rigid foam — 4,000 to 13,000 PSI — and fills the void from the bottom to the top, compressing and stabilizing the surrounding soil as it expands. The work is monitored in real time, inch by inch, foot by foot. No excavation. No dewatering. No one enters the pipe, and the street above stays open.

Proven in the field: at the City of Sarasota’s Lift Station 87, Deep Horizons Injection Grouting sealed infiltration and inflow through holes, breaks, and joint failures in a 75-foot section of 36-inch PVC lateral, 35 feet below ground, inside an active construction zone. CIPP lining and conventional polyurethane injection had already been tried there — and had failed. Excavation was estimated at $14,000,000 and 12 months. DHIG completed the seal for $87,000 in 5 days.

The result is a permanent seal and stabilized soil in one pass, adding on the order of 100 years of service life — without digging the pipe up.

Polymer Technologies USA — Deep Horizons Injection Grouting. (813) 704-7941 · polymertechnologiesus.com